A daily meeting that gets shorter

A product team of eight to twelve people, spread across several time zones and shipping a new web app, ran a daily status meeting on a generated agenda toward a release date, every working day for a month. These four parts are that month.

A heap of loose blank paper slips beside an ordered stack held by a brass clip, with one clip joining it to the next day's stack.
What it is
A daily status meeting toward a release, run on an agenda generated from the tracker, the chat archive and yesterday's note.
What changed
What the room confirms stays on the page the room looks at. Everything else moved into the data, with an owner and a source on every line.
What it will not do
Close anything on a guess, write the facilitator's question, send the recap, or count work per person.

Before

A daily meeting that left nothing behind

The meeting was a half-hour status call toward a dated release, and in its first week it ran well past its slot.

And afterwards, nothing. No note, no list, nothing for the next morning to start from. That is the failure under all the others, and it is not the one people expect: what was missing was never a better summary of the meeting that had just happened.

You do not need the summary after the meeting. You need it before the next one.

Which turns the loop around. The recording is not documentation — it is the raw material for tomorrow's agenda. What the room does with its half-hour is diverge and confirm, on a page that already exists when it sits down, and the process around that is the whole of it.

Before

Now

  1. BeforeThe meeting left nothing behind NowOne pass over the recording builds the next agenda
  2. BeforeThe next morning started from nothing NowThe card is ready before the room sits down
  3. BeforeA dependency list was walked row by row NowDependencies are raised by the person, in their minute
  4. BeforeItems with no owner stayed on the list forever NowEvery carried line has an owner and a source
  5. BeforeThe detail existed nowhere NowThe detail and the measures are the facilitator’s own file
The same meeting, the same team. What changed is where each thing lives: in someone's memory, or in a file with an owner and a source.

What it gives you

What a summary on its own cannot do

Every meeting tool on the market will write you a summary. Three things here are not a summary, and they are the reason the meeting got shorter rather than better documented:

The division underneath is the one the two-hubs page makes: something turns speech into text, and something else decides what the text means. The first is a commodity with several good providers. The second is the framework, and it is the part that is not interchangeable.

One project team, one month, written from that team's own agendas, daily notes and the change requests the month produced. The team is not named, and no measurement from its month is published here.